How To Calculate Cement Sand And Aggregate For M20 Concrete Yout How much sand required for m20 concrete. there are 19 cubic feet, 0.42 m3, or 680 kgs of sand are required for 1 cubic meter of m20 concrete with mix ratio 1 cement: 1.5 sand: 3 aggregate (1:1.5:3) and water cement ratio is kept between 0.4 to 0.6. we have given dry volume of concrete is equal to 1.54 cubic metre and part of sand in concrete. Concrete mix design calculation m20, m25, m30.

how To Calculate Quantity Of Cement Sand And Aggregate For M20 Grade
how To Calculate Quantity Of Cement Sand And Aggregate For M20 Grade

How To Calculate Quantity Of Cement Sand And Aggregate For M20 Grade Calculate the concrete quantity required in cubic meter and then multiply the quantity with the cement sand and aggregate for 1 cubic meter of concrete. in your case volume of concrete = 1.7 x 1.7 x 0.5 = 1.4 cu.m it looks like you are using m20 grade mix with extra sand. if you follow that mix proportion then to calculate use this following. Concrete calculator estimate cement, sand, gravel. Calculating the m20 concrete ratio involves determining the correct proportions of cement, sand, aggregate, and water needed to achieve this strength. specifically, the mix ratio for m20 grade concrete is designated as 1:1.5:3. this means for every part of cement, 1.5 parts of sand and 3 parts of aggregate are mixed. Rcc calculator | free estimate of cement, sand and aggregate.

Comments are closed.