Ultimate Solution Hub

Initial Set Up Procedure Crystal Mountain Storm Bottom Load Water Cooler

initial set up procedure вђ crystal mountain storm bott
initial set up procedure вђ crystal mountain storm bott

Initial Set Up Procedure вђ Crystal Mountain Storm Bott Initial set up procedure – crystal mountain, storm bottom load water cooler. Initial set up procedure pere ocean crystal mountain storm bottom load water dispenser(english version)the bottom load model means no more lifting heavy b.

initial set up procedure вђ crystal mountain storm bott
initial set up procedure вђ crystal mountain storm bott

Initial Set Up Procedure вђ Crystal Mountain Storm Bott Summary of contents for crystal mountain storm. page 1 storm bottom load water dispenser user manual page 2 1.indicator lights 5.led nightlight (top) – replace bottle alarm light 6.drip tray and cover (bottom) – replace smartflo sf 1 water blue cartridge alarm light 7.energy saving switch (hot water) 2.cold water lever 8.bottle adaptor. About press copyright contact us creators advertise developers terms privacy policy & safety how works test new features nfl sunday ticket press copyright. Install the connector and corrugated tube into the inlet through cooler to bottom (figure 7 26 and figure 7 27). insert the reservoir into evaporator (figure 7 28). ensure the smartflo™ water cartridge is installed properly. turn the 2 knob to lock the smartflo™ water cartridge (figure 7 29 and figure 7 30). 1. unpack and rinse: a. unpack: 1) slide the access door upwards to open (figure 4 1). 2) unstrap the velcro belt, remove the pou kit along with the 2 pcs foam pads and plastic bag (figure. 4 2). (discard: strap, foam pads and bag) figure 4 1.

Comments are closed.